- 10.3.2.2 Upgrade was applied. ETS encountered a problem with form publishing after
the upgrade. It happened once before and OU rebooted the database to correct the
problem. OU is investigating. Chris will add notes for future upgrades that a possible
restart of the SQL database may be required by OU.
- Micah received confirmation that a secondary web server for the test account will
be provided so that no one accidentally tries to run a publish from this test account
over to the live site. It will be set up before the test migration.
- There was discussion whether to create a separate skin for De Anza. It was decided
to use the same skin and one account for De Anza for now.
- Another update 10.3.2.3 is required for SaaS (Does not affect ESL systems). Very
minor incremental update; will be released tonight or tomorrow night. SaaS upgrade
needs to be done, OU cannot hold it back for one client. If it is required for the
ESL side prior to our transport, OU will let us know. Currently we are scheduled
for the transport on 11/16 with a starting time of 8 a.m. and will take approximately
4-5 hours.
- De Anza users will be locked out while the transporter is running. Larry will notify
the users.
- Data transport should take 1-2 hours. Impact on the network traffic should be relatively
low; it will be a continual encrypted stream, probably a few hundred megabytes. Should
not impact users on the ESL side.
- There is no pretest procedure for the transporter. If they run into any problems,
they will try and resolve it but if it cannot be resolved quickly, we will reschedule
the transport to a further date.
- Micah will forward the network requirements ahead of time. Chris will be the contact.
- Tools themselves are VPN unaware. They will need the VPN chain open. Micah will pretest.
- There is an opened ticket (#29-525) which will be used to update the migration progress
on November 16th. Chris and Hasan should be on the ticket. Micah will be standing
by on 11/16. Chris will communicate to De Anza when users can log back in.
- Take away items:
- Larry will notify users of the 4-5 hour lock out on 11/16.
- Micah will provide the network requirements to Chris, pretesting VPN and port access.
- Nov. 16th 8 a.m.-completion, Micah, Chris and Hasan will be on stand by.
- Micah will communicate progress or problems to Chris.
- Does moving to a ESL system affect third party authentication with Webdav? OU will
research.