TopTable_r1_c1: Building Community Excellence Site Link
General District Information Business Services Human Resources Operations and Maintenance Purchasing Services Foothill-De Anza District Foundation Technology Services Research Services
Foothill De Anza
leftcurve1:
leftcurve2:  
   
Fast Answers  
faqs Finding a job Employee QuickHelp Doing Business Community Interest  
 
 

  ETAC Committee

May 13, 2009 Minutes

 

EDUCATIONAL TECHNOLOGY ADVISORY
COMMITTEE

May 13, 2009

ATTENDEES: Rich Hansen, Kurt Hueg, Stan Judkins, Sherri Mines, Leif Nelson, Jerry Rosenberg, Fred Sherman, Alex Swanner, Pam Wilkes

GUESTS: Sharon Luciw, Chien Shih, David Gillett

Convened:  12:32 pm

1.  INTRODUCTIONS (All)

2. APPROVAL OF THE MINUTES (Fred)

  • Will stand approved as posted

3.  GENERAL NEWS (ALL)
  •   None was brought up

4. HW/SW STANDARDS COMMITTEE MEETING (Sharon)
  •  Current optional peripheral HP scanner on the Standards list has been discontinued

    The new model has arrived and Tech Services will be testing it to make certain that it is fully compatible

  •   There was a lot of discussion about the multi media rooms and the particular control system that is currently being looked at to standardize on 

    Decided to put together a sub committee to do an evaluation on the consol system that is being suggested and make sure that all the user and support requirements are being met

    There will be faculty on the committee

    Dan Mitchell from DA and not sure who from FH
    Sharon will go to each of the Technology Task Force meetings and ask for people to participate

5. EIS STATUS (Chien)
  •  In April got all the general person ID's migrated over from our legacy system to Banner

  • About 8,000 student, faculty and classified staff ID's

  •   Single sign on from Luminis into Banner is ready
  •   Did a project go-live assessment

  • An outside audit was done to make sure that everything is ready for the Finance module go-live July 1st

    Wanted to make certain that there won't be any surprises

    Got a clean bill of health

  •   By May 15th will be shifting from a testing environment to a production environment

    The production environment will be the real environment Banner will run from

  •   Will also be doing the system load testing this month

    Will be testing to see if our system can handle 5,000 simultaneous log ons plus 300 finance users logging into the finance package from the outside

    This will be done by using our own users names and passwords

  •   Beyond July 1st we will be going live with the HR (1/2010) and Student (4/2010) modules

    Talking to Chabot-Las Positas CCD about the HR module

    Went on a field trip on Monday, May 11th, trying to understand our issue running in their live environment

  •   By June 1st the system will freeze for production

    Will start to enter real live PR's into the system

6.  MEETING MAKER MIGRATION (Sharon / Chien)
  •   Original plan was to upgrade to 8.7.1 but during the testing of the software 8.8 came out

    The decision was to go with the newest version to avoid yet another upgrade

    Had to take a little more time to be able to do some testing on version 8.8

  •   The IS department has already backed up the old 8.5 version in case of an emergency
  •   Did a test run with version 8.8 and it works okay
  •   Sharon has done numerous postings of instructions to make certain that everyone is aware of what is going to happen and how to deal with it

  • Wanted to make certain that everyone was aware of the fact that all data older than January 2007 was going to be purged and that there is no way of getting it back after the purge

  •   There weren't any instructions for Palm users, because it is not officially supported by ETS

    Sharon said that she would check into it
    According to Chien, one of the features of 8.8 is the supportability of portable devices

7. SECURITY INCIDENTS (Sharon)
  •   Sharon had a list of 11 incidences since 3/31/09

    1.    On 3/31 there was a computer that appeared to be compromised with the Conficker virus
    2.    On 4/17 Sharon received an e-mail that someone was claiming that the offensive postings they were receiving on their forum came form a computer that was attached to our network – unable to track since it was in the range of the guest wireless on the DA campus
    3.    On 4/23 there was a large amount of Spam coming from a district e-mail account  (FH ASFC Smart Shop) – ETS tracked down the account and blocked it - the district was getting messages from service organizations that they were going to blacklist FHDA
    4.    On 4/24 Sharon sent out an e-mail about a fraudulent message that claimed it was sent out by the Call Center asking for a User Name and Password for verification
    5.    On 4/27 an instructor at FH exposed SSN's by coping a file onto an unsecured academic server – only about 100 students affected and notifications are being sent out
    6.    On 4/28 report of a possible identity theft problem
    7.    On 4/29 due to an unlocked door thieves took an iMac computer and attempted to remove the projector that was mounted in the room
    8.    On 4/29 the main DA web server was compromised with a BOT
    9.    On 5/7 there was a threatening e-mail to a DA staff member
    10. On 5/12 possible phishing: DAINTERN e-mail box at FHDA – being used to send out e-mails
    11. On 5/12 there was a spambot on the FH campus - on a Dell computer in one of the trailers in lot 6

8.  DISASTER RECOVERY (Chien)
  •   Although disasters don't happen often it is something we need to be prepared for
  •   We are focusing on how to protect our data first
  •   Have established a site in Carlsbad
  •   The system has been powered up and running

    There is a secure, private DSL line for FHDA to connect to the site for internal maintenance purposes
    Our people already have access to the server and database located in Carlsbad and are currently doing configuration work
    We have a 1 (one) Gigabit link through CENIC

    Installation will occur between May 17th – June 17th
    Have already verified that the site, and the fiber channel pipe are already in place only need to connect to the site

    Anticipate that by July 1st, we will have data duplication between the two sites

    All the data that we have at FHDA will be replicated down in Carlsbad, as well as the application itself

    If we get a total shutdown of the system here for any reason, we can still have about 99.9% of the data available that we can immediately connect to in order to continue operations

    It is a hot site, real time up dating – a unique system in the California Community College system

    Have only heard of one other Community College on the east coast trying to do what we are doing
    Most Community Colleges in our system do disaster recovery by back up tape

    Usually takes several weeks to recover from this type of system

  •   Any EIS system we go live with will be automatically replicated at the disaster recovery site

  •   Anticipate the that site will become fully operational by September 1st, 2009

9. IMPACT OF BUDGET CUTS (Sharon/Chien) .
  •   Like every area of the District, ETS was ask to take their fair share of budget cuts

    We took them using a variety of means

    1)    Cut contracts – about $250K of annual costs

    This did not count towards our prorated amount of our share

    2)    For our prorated share: we cut "B" budgets back; and are in the process of giving alerts out that layoffs might occur, and for a great majority of our staff were able to reassign work into Measure "C" projects – the funding lasts as long as the project or for as long as there is funding in Measure "C" (which ever comes first)

    At the end of this time, we will be faced with the same dilemma that everyone has been faced with

    These cuts will have an impact on the kind of services we can provide

  •   Chien's area can be divided into three basic types of activity

    1)    Essential core activities – something that if it happens, you drop everything else because you have to do it
    2)    Scheduled, planned activity – things you have to do by a certain date
    3)    It would be nice to have, but not necessary and is additional work for ETS

  •   Chien's area has one position that has been cut 50% and another position being funded by EIS backfill dollars
  •   In Sharon's area the priorities will be those essential functions for the district and for those additional things, the response time is going to grow longer

  • Won't be able to guarantee same day response for any kind of repairs
    For a security incident; a district wide outage; in classroom emergencies these will be handled first
    Measure "C" is a bullet train that left the station and you can't stop it, so it needs to continue to be supported
    The Measure "C" technology projects, such as the network refresh are a year behind based on other priorities that happened around the district

    Have started working on it again and can't let anything interrupt it any longer

    Network security deployment of equipment; telephone replacement which is coming up in about three years and can't hold off on it; pent up demand to get wireless deployed throughout (boarder line essential service – nice to have but not a necessity); encryption for laptops and desktops is an essential project that needs to be popped up to the top of the list

    Anything beyond this is a prioritization and a negotiation with the colleges as to what order do we start working on things

    When people get moved over to measure "C" there is less flexibility in how that particular staff can be used

    Things are going to get stretched out and it will take longer to get things done

    Biggest impact is that there is no guarantee of same day service for an individual
    There are certain departments/labs that have IA's (Instructional Associates) that are performing some level of tech service which do not belong to ETS

    Do not know how they are being affected

    Usually find out after someone has been reassigned and then they come to ETS to take over the function
    More and more the colleges are asking ETS to take over the management of the labs and yet we aren't getting any more staff

    Are currently looking at how the labs can be managed in a more standardized, automated and remote fashion

10. FUTURE AGENDA ITEMS (ALL)
  •   None were brought forward

11. ADJOURNMENT
  • Adjourned:  1:27 pm

Next Meeting: Wednesday, June 10, 2009, via video conferencing

 
 

 

Last Updated: Tuesday, June 9, 2009 at 1:46:51 PM
©2009 Foothill-De Anza Community College District

 
Home Foothill De Anza
 About Us Business Human Resources Facilities Purchasing Foundation Technology Research
Home